Translations:How to operate relay line block equipment/14/en

From SimRail Wiki
Revision as of 01:58, 18 April 2024 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Main signal has been set to clear
  • line repetition interlock is effective (red)
  • Main signal has reached the stop position again

Now the Po button can be pressed. The corresponding block field is blocked (red) and the line repetition interlock becomes ineffective.

402266806 20221224161640 1(2).jpg.png