Translations:How to operate relay line block equipment/14/en

From SimRail Wiki
Jump to navigation Jump to search
  • Main signal has been set to clear
  • line repetition interlock is effective (red)
  • Main signal has reached the stop position again

Now the Po button can be pressed. The corresponding block field is blocked (red) and the line repetition interlock becomes ineffective.