Translations:How to operate relay line block equipment/41/en

From SimRail Wiki
Revision as of 00:52, 18 April 2024 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The Eap block always allows a track to be operated in both ways while being under technical protection, so there will also be "NP" and "NO" buttons where fitted, provided it is a double-track line. Notes for the operation of "NO" and "NP" are as described for SBL installations (see below), provided that movements take place on the opposite track.