Translations:How to operate relay line block equipment/41/en

From SimRail Wiki
Jump to navigation Jump to search

The Eap block always allows a track to be operated in both ways while being under technical protection, so there will also be "NP" and "NO" buttons where fitted, provided it is a double-track line. Notes for the operation of "NO" and "NP" are as described for SBL installations (see below), provided that movements take place on the opposite track.