Translations:How to operate relay line block equipment/14/en: Difference between revisions

From SimRail Wiki
Jump to navigation Jump to search
FuzzyBot (talk | contribs)
Importing a new version from external source
 
FuzzyBot (talk | contribs)
Importing a new version from external source
 
Line 1: Line 1:
''The block fields in detail:''
* Main signal has been set to clear
* line repetition interlock is effective (red)
* Main signal has reached the stop position again
Now the Po button can be pressed. The corresponding block field is blocked (red) and the line repetition interlock becomes ineffective.
[[File:402266806 20221224161640 1(2).jpg.png|center]]

Latest revision as of 00:58, 18 April 2024

  • Main signal has been set to clear
  • line repetition interlock is effective (red)
  • Main signal has reached the stop position again

Now the Po button can be pressed. The corresponding block field is blocked (red) and the line repetition interlock becomes ineffective.