Translations:How to operate relay line block equipment/86/en

From SimRail Wiki
Jump to navigation Jump to search

The neighbouring signal box must now cooperate and agree to the change of direction. As soon as this has happened, the departure permission indicator and all block section indicators light up in steady white light. The direction of run has now been changed and a train can be released.