Translations:How to operate relay line block equipment/77/en
Jump to navigation
Jump to search
When setting routes, nothing else has to be considered, the equipment of the line block usually does not have to be operated and will work automatically. A main signal in the direction of the SBL line can be set to clear as soon as the first block section is indicated as clear. In addition, the reception of permission must also be indicated.