Translations:Góra Wlodowska/3/en
Jump to navigation
Jump to search
Tracks in the station
The main railway tracks consist of the 1st and 2nd track. The level crossing also has two sidings tracks which can be used to overtake higher category trains or to give priority to another type of train in the event of delays.
The third station track is specific in that there is a slow speed of 20 Km/h in the direction of Zawiercie before the switches to the main track.
There is also an unused track that runs into the station, which runs into the fourth station track.
