Translations:Dabrowa Górnicza Wschodnia/5/en

From SimRail Wiki
Jump to navigation Jump to search

SZZ and local conditions

  • All switches are 40km/h only
  • Domino
  • 6 transport tracks
  • platforms in the 1st and 2nd station track.
  • 4 handling tracks, one of which is piecewise
  • 10 track in lockout and without overhead contact line
  • Switches 61ab and 62ab can be changed in an emergency way by means of chokes Jz61ab and Jz62ab