Translations:Opoczno Poludnie/3/en
Jump to navigation
Jump to search
Tracks in the station
In 2014, a single-sided platform was built in the station on the 4th track and a culvert in the middle of the station track was reconstructed. The protective rib was also extended - track 4a was created, protected by a derailment. Minor reconstruction of the SRK equipment was also carried out, allowing entrances and exits to and from tracks 3 and 4 at speeds of up to 60 km/h. However, the remains of the sidings and the ruins of the maintenance depot were removed.[1]