Translations:Dabrowa Górnicza Zabkowice/4/en

From SimRail Wiki
Revision as of 21:07, 24 April 2023 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Behind the branch in the course of line No. 133 is group B - "maczkowska", which consists of 10 main tracks. These tracks serve several sidings branching off in the area, the most important of which are the sidings of the Katowice Steelworks, Mostostal, PPRH Bobrek or Dom Plus. To the east of the group's tracks is also a small loading yard, whose tracks are used by the operations section and FHU Medex. The movement of trains on the main main tracks and additional odd-numbered tracks is carried out by the "DZB" control station, while part of the turnouts in the even-numbered tracks are operated by the "DZB2" control station, which has key and centralized mechanical equipment.[1]

Error creating thumbnail: File with dimensions greater than 12.5 MP
Dąbrowa Górnicza Ząbkowice, Source Semaforek.pl