In May 2013, a new, containerised signal was put into operation near the pedestrian crossing. The crossing itself was secured with horns. Some of the switches on the north head of the switch were also removed, allowing the speed in the station to be increased to 100 km/h. Previously it was limited to 40 km/h due to the existing unprotected pedestrian crossing. The speed was also limited by the geometry of the switch head on the Ząbkowice side.
In 2015, the island platform was repaired and a new shelter for passengers was placed there.[1]