Translations:Józefinów/2/en

From SimRail Wiki
Revision as of 03:12, 2 March 2023 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The post was thoroughly modernized in 2014 - the track surface of Line 1 was replaced (without the turnouts - these were replaced earlier). The viaduct over line No. 19 was also replaced - the new construction allowed the pavement to be laid on ballast, without the use of bridge girders. The track layout remained unchanged, while new traffic control equipment was built in a container, opposite the existing signal box. The post is controlled remotely from the Pruszków station.[1]