Translations:How to operate relay line block equipment/16/en
Jump to navigation
Jump to search
This example takes places in station Dąbrowa Górnicza Wschodnia. The shown line consists of two line tracks and is equipped for left-line running under us of regular main signals. For this reason, Permission fields (blok pozwolenia, Poz) is in place.
In case we are expecting a train from the neighbouring signal box, our end field (Ko) is blocked (red) after the train has left the neighbouring station.
The entry to our station has been set to clear
The train has passed our entry signal and sets it back to stop automatically
The train now cleared the first track circuit behind the entry signal. Clearance indicator is lit.