Translations:How to operate relay line block equipment/82/en
Jump to navigation
Jump to search
Driving on the left track can be used to accelerate the operational flow (e.g. overtaking on the run). In addition, the permanently installed change of direction simplifies operations during construction work, track closures, broken down trains, disruptions, etc. that only affect one track.