Translations:How to operate relay line block equipment/45/en

From SimRail Wiki
Revision as of 00:52, 18 April 2024 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

If the train is not supposed to run anymore, the activation of the block section can still be cancelled after acception. However, this is only possible if the line repetition interlock has not gone active. First we have to pull the "Wbl" button, then the activation in the neighbouring signal box has to be cancelled as well. As soon as this is successful, the system returns to the neutral default position. But in this case we really want the train to proceed and clear the signal.

20230126014800.png

The line repetition interlock (Pwl) becomes effective when our exit signal is in the clear position. It will remain effective when the exit signal is set to stop again manually.