Translations:How to operate relay line block equipment/37/en

From SimRail Wiki
Revision as of 00:52, 18 April 2024 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

If the train has been through the block section and has passed our entry signal, it is now time to get active, so that we can release the line for the next train. In order to unblock (whiten) the end field (Ko), the following technical requirements are to be met: