Translations:How to operate relay line block equipment/29/en

From SimRail Wiki
Revision as of 00:52, 18 April 2024 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

If the train passes the signal showing "clear", it is time to give "the train in section" signal and thus report the line as occupied. The following technical requirements must be met for operating the starter field (Po):