Translations:How to operate relay line block equipment/28/en

From SimRail Wiki
Revision as of 00:52, 18 April 2024 by FuzzyBot (talk | contribs) (Importing a new version from external source)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

ATTENTION: If the signal is brought back to stop before a train has passed, the line repetition interlock remains active (red). The main signal cannot be set to clear again until a train passed the block section under regular operation of line block equipment.