Translations:How to operate relay line block equipment/28/en
Jump to navigation
Jump to search
ATTENTION: If the signal is brought back to stop before a train has passed, the line repetition interlock remains active (red). The main signal cannot be set to clear again until a train passed the block section under regular operation of line block equipment.