Translations:Train interlockings/2/en: Difference between revisions

From SimRail Wiki
Jump to navigation Jump to search
FuzzyBot (talk | contribs)
Importing a new version from external source
 
FuzzyBot (talk | contribs)
Importing a new version from external source
Line 1: Line 1:
In Poland, only part of the CMK section (Grodzisk Mazowiecki - Idzikowice) and the section Włoszczowa Północ - Zawiercie are operated in Full Control - L2 mode.[[File:ETCS baliza.png|none|thumb|[[File:ETCS baliza1.png|none|thumb]]ETCS modules that are placed in front of the autoblocks/signals.]]
In Poland, only part of the CMK section (Grodzisk Mazowiecki - Idzikowice) and the section Włoszczowa Północ - Zawiercie are operated in Full Control - L2 mode.[[File:ETCS baliza.png|none|thumb|[[File:ETCS baliza1.png|none|thumb]]ETCS modules that are placed in front of the autoblocks/signals.]]
==Czuwak aktiwny==
[[File:Czuwak.png|center|frameless|191x191px]]
Active vigilance (CA) is an electronic device that is part of the so-called train protection system (ABB). Its purpose is to ensure the safe running of trains and to increase railway safety. The purpose of the CA is to check the driver's alertness every 60 seconds if the speed of the driving vehicle is greater than 10% of the maximum line speed or Vmax of the train.
If the driver does not react in time to the light signal in the driver's cab, after 7 seconds the train's speed brake will be applied.

Revision as of 22:22, 30 March 2023

Information about message (contribute)
This message has no documentation. If you know where or how this message is used, you can help other translators by adding documentation to this message.
Message definition (Train interlockings)
In Poland, the Full Control - L2 mode is used only on part of the CMK Włoszczowa Północ - Zawiercie. L1 mode is used on the part (Grodzisk Mazowiecki - Idzikowice).[[File:ETCS baliza.png|none|thumb|[[File:ETCS baliza1.png|none|thumb]]ETCS modules that are placed in front of the autoblocks/signals.]]

In Poland, only part of the CMK section (Grodzisk Mazowiecki - Idzikowice) and the section Włoszczowa Północ - Zawiercie are operated in Full Control - L2 mode.

ETCS modules that are placed in front of the autoblocks/signals.