== ARR (Automatic Speed Regulation) - Cruise Control ==
The locomotive is equipped with an '''Automatic Speed Control (ARR)''' feature—a cruise control system that allows the engineer to set a desired target speed. The operation of the ARR on this locomotive is slightly different from modern units like the EN96; more specific steps are required to engage the system correctly.
In the 163 series locomotives (known as "Peršing"), the '''ARR (Automatic Speed Regulation)''' system is more complex than in modern Pesa Elf (EN96) units, as it requires interaction with other systems, such as mode selection and current limitation settings.
Revision as of 10:18, 18 January 2026
ARR (Automatic Speed Regulation) - Cruise Control
In the 163 series locomotives (known as "Peršing"), the ARR (Automatic Speed Regulation) system is more complex than in modern Pesa Elf (EN96) units, as it requires interaction with other systems, such as mode selection and current limitation settings.