Pilichowice: Difference between revisions
No edit summary |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
[[file:Pilichowice 2.jpg|thumb|Pilichowice]]'''Pilichowice''' is a branch station built in 2017 on one of the longest routes of the main railway line, between Opoczno and Olszamowice (32 km; the longest route on the CMK is Psary - Gora Włodowska - 36 km, but with a much smaller number of trains). The contribution is intended to help with the modernisation works (reconstruction of utilities and overhead lines) planned for this section until 2023. The complete track layout, consisting of four switches allowing speeds of up to 100 km/h in the return direction, was built in July and August 2017, i.e. during the shutdown. A signal equipped with a computerised MOR-3 type device, remotely controlled from Opoczno Południe station, was also built at the level of the points.[https://semaforek.kolej.org.pl/wiki/index.php?title=Pilichowice <nowiki>[1]</nowiki>] | <languages /> | ||
<translate> | |||
<!--T:1--> | |||
[[file:Pilichowice 2.jpg|thumb|Pilichowice]] | |||
'''Pilichowice''' is a branch station built in 2017 on one of the longest routes of the main railway line, between Opoczno and Olszamowice (32 km; the longest route on the CMK is Psary - Gora Włodowska - 36 km, but with a much smaller number of trains). The contribution is intended to help with the modernisation works (reconstruction of utilities and overhead lines) planned for this section until 2023. The complete track layout, consisting of four switches allowing speeds of up to 100 km/h in the return direction, was built in July and August 2017, i.e. during the shutdown. A signal equipped with a computerised MOR-3 type device, remotely controlled from Opoczno Południe station, was also built at the level of the points.[https://semaforek.kolej.org.pl/wiki/index.php?title=Pilichowice <nowiki>[1]</nowiki>] | |||
<!--T:2--> | |||
====Location on the track==== | ====Location on the track==== | ||
[[file:Pilichowice map.png|thumb|Pilichowice|center]] | [[file:Pilichowice map.png|thumb|Pilichowice|center]] | ||
<!--T:3--> | |||
==Tracks in the station== | ==Tracks in the station== | ||
The main railway tracks consist of the 1st and 2nd station tracks without sidings. In this station it is only possible to change from the first track to the second track and vice versa.[[file:Pilichowice semaforek.png|center|thumb|Pilichowice, Source Semaforek.pl]] | The main railway tracks consist of the 1st and 2nd station tracks without sidings. In this station it is only possible to change from the first track to the second track and vice versa. | ||
[[file:Pilichowice semaforek.png|center|thumb|Pilichowice, Source Semaforek.pl]] | |||
<!--T:4--> | |||
===Speeds at switches=== | ===Speeds at switches=== | ||
[[File:Pilichowice speed.jpg|alt=|center|Author: '''bprog''']] | [[File:Pilichowice speed.jpg|alt=|center|Author: '''bprog''']] | ||
<!--T:5--> | |||
==Gallery== | ==Gallery== | ||
<gallery caption="Pictures from the station"> | <gallery caption="Pictures from the station"> | ||
Line 22: | Line 30: | ||
File:pilichowice 4.jpg | File:pilichowice 4.jpg | ||
</gallery> | </gallery> | ||
<!--T:6--> | |||
======Thanks for creating this page====== | ======Thanks for creating this page====== | ||
*Roman - Created page | *Roman - Created page | ||
*Bprog - Pictures of speeds through switches. | *Bprog - Pictures of speeds through switches. | ||
</translate> |
Latest revision as of 20:49, 24 April 2023
Pilichowice is a branch station built in 2017 on one of the longest routes of the main railway line, between Opoczno and Olszamowice (32 km; the longest route on the CMK is Psary - Gora Włodowska - 36 km, but with a much smaller number of trains). The contribution is intended to help with the modernisation works (reconstruction of utilities and overhead lines) planned for this section until 2023. The complete track layout, consisting of four switches allowing speeds of up to 100 km/h in the return direction, was built in July and August 2017, i.e. during the shutdown. A signal equipped with a computerised MOR-3 type device, remotely controlled from Opoczno Południe station, was also built at the level of the points.[1]
Location on the track
Tracks in the station
The main railway tracks consist of the 1st and 2nd station tracks without sidings. In this station it is only possible to change from the first track to the second track and vice versa.
Speeds at switches
Gallery
Thanks for creating this page
- Roman - Created page
- Bprog - Pictures of speeds through switches.