Translations:Bedzin/4/en: Difference between revisions
Jump to navigation
Jump to search
(Importing a new version from external source) |
(Importing a new version from external source) |
||
Line 1: | Line 1: | ||
==Traffic on the track== | |||
====SZZ and local conditions==== | ====SZZ and local conditions==== | ||
The station is a corridor station: | The station is a corridor station: | ||
<br> | <br> | ||
* All switches have a speed limit of 40km/h. | *All switches have a speed limit of 40km/h. | ||
* Relay signalling equipment | *Relay signalling equipment | ||
* 6 railway tracks | *6 railway tracks | ||
* Platforms at tracks 1 and 2 | *Platforms at tracks 1 and 2 | ||
* 5 maintenance tracks | *5 maintenance tracks |
Latest revision as of 19:31, 24 April 2023
Traffic on the track
SZZ and local conditions
The station is a corridor station:
- All switches have a speed limit of 40km/h.
- Relay signalling equipment
- 6 railway tracks
- Platforms at tracks 1 and 2
- 5 maintenance tracks