Translations:Bedzin/4/en: Difference between revisions
Jump to navigation
Jump to search
(Importing a new version from external source) |
(Importing a new version from external source) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
== | ==Traffic on the track== | ||
====SZZ and local conditions==== | |||
The station is a corridor station: | |||
<br> | |||
*All switches have a speed limit of 40km/h. | |||
*Relay signalling equipment | |||
*6 railway tracks | |||
*Platforms at tracks 1 and 2 | |||
*5 maintenance tracks | |||
Latest revision as of 19:31, 24 April 2023
Traffic on the track
SZZ and local conditions
The station is a corridor station:
- All switches have a speed limit of 40km/h.
- Relay signalling equipment
- 6 railway tracks
- Platforms at tracks 1 and 2
- 5 maintenance tracks