Translations:Józefinów/3/en: Difference between revisions

From SimRail Wiki
Jump to navigation Jump to search
FuzzyBot (talk | contribs)
Importing a new version from external source
 
FuzzyBot (talk | contribs)
Importing a new version from external source
 
Line 1: Line 1:
== Location on the track ==
The post was thoroughly modernized in 2014 - the track surface of Line 1 was replaced (without the turnouts - these were replaced earlier). The viaduct over line No. 19 was also replaced - the new construction allowed the pavement to be laid on ballast, without the use of bridge girders. The track layout remained unchanged, while new traffic control equipment was built in a container, opposite the existing signal box. The post is controlled remotely from the Pruszków station.[https://semaforek.kolej.org.pl/wiki/index.php?title=J%C3%B3zefin%C3%B3w <nowiki>[1]</nowiki>]
[[File:Jozefinow map.png|center|thumb|Józefinów]]

Latest revision as of 19:18, 24 April 2023

Information about message (contribute)
This message has no documentation. If you know where or how this message is used, you can help other translators by adding documentation to this message.
Message definition (Józefinów)
The post was thoroughly modernized in 2014 - the track surface of Line 1 was replaced (without the turnouts - these were replaced earlier). The viaduct over line No. 19 was also replaced - the new construction allowed the pavement to be laid on ballast, without the use of bridge girders. The track layout remained unchanged, while new traffic control equipment was built in a container, opposite the existing signal box. The post is controlled remotely from the Pruszków station.[https://semaforek.kolej.org.pl/wiki/index.php?title=J%C3%B3zefin%C3%B3w <nowiki>[1]</nowiki>]

The post was thoroughly modernized in 2014 - the track surface of Line 1 was replaced (without the turnouts - these were replaced earlier). The viaduct over line No. 19 was also replaced - the new construction allowed the pavement to be laid on ballast, without the use of bridge girders. The track layout remained unchanged, while new traffic control equipment was built in a container, opposite the existing signal box. The post is controlled remotely from the Pruszków station.[1]