Juliusz/en-gb: Difference between revisions

From SimRail Wiki
Jump to navigation Jump to search
(Updating to match new version of source page)
(Updating to match new version of source page)
 
(2 intermediate revisions by the same user not shown)
Line 13: Line 13:
==Tracks in the station==
==Tracks in the station==
[[File:Juliusz semaforek.png|center|thumb|Juliusz, Source Semaforek.pl]]
[[File:Juliusz semaforek.png|center|thumb|Juliusz, Source Semaforek.pl]]
* All switches are 40km/h only
</div>
</div>


Line 27: Line 28:
File:Juliusz 8.png
File:Juliusz 8.png
</gallery>
</gallery>
</div>
<div lang="en" dir="ltr" class="mw-content-ltr">
======Acknowledgements on the creation of this page======
======Acknowledgements on the creation of this page======
*Roman - Created page
*Roman - Created page
*Bprog - Speed information via switches.
</div>
</div>

Latest revision as of 17:02, 24 April 2023

Juliusz

It is only a switching point. There are no platforms.

Julius is a junction station, where the track to the Julius processing factory branches out. Originally, access to the siding was possible from both the Dańdówka and Dorota sides - via track No. 4. However, it is currently closed, while access is only possible from the Dorota side. This track is terminated by a retaining trestle, and the exit towards Dorota is protected by a protective rib. Entry from the siding is possible on a signal on the shunting dial. Train traffic at the station is conducted by the "KJ" signal box, which has E-type relay equipment with light signaling. From the signal box, the horns on the level crossing are also operated.

In 2015, the station was reclassified from a siding to a branch and freight station.[1]

Tracks in the station

Juliusz, Source Semaforek.pl
  • All switches are 40km/h only

Gallery

Acknowledgements on the creation of this page
  • Roman - Created page
  • Bprog - Speed information via switches.