Juliusz: Difference between revisions

From SimRail Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 6: Line 6:


<!--T:3-->
<!--T:3-->
Julius is a junction station, where the track to the Julius processing factory branches out. Originally, access to the siding was possible from both the Dańdówka and Dorota sides - via track No. 4. However, it is currently closed, while access is only possible from the Dorota side. This track is terminated by a retaining trestle, and the exit towards Dorota is protected by a protective rib. Entry from the siding is possible on a signal on the shunting dial. Train traffic at the station is conducted by the "KJ" signal box, which has E-type relay equipment with light signaling. From the signal box, the horns on the level crossing are also operated..
Julius is a junction station, where the track to the Julius processing factory branches out. Originally, access to the siding was possible from both the Dańdówka and Dorota sides - via track No. 4. However, it is currently closed, while access is only possible from the Dorota side. This track is terminated by a retaining trestle, and the exit towards Dorota is protected by a protective rib. Entry from the siding is possible on a signal on the shunting dial. Train traffic at the station is conducted by the "KJ" signal box, which has E-type relay equipment with light signaling. From the signal box, the horns on the level crossing are also operated.


<!--T:4-->
<!--T:4-->

Latest revision as of 15:54, 24 April 2023

Juliusz

It is only a switching point. There are no platforms.

Julius is a junction station, where the track to the Julius processing factory branches out. Originally, access to the siding was possible from both the Dańdówka and Dorota sides - via track No. 4. However, it is currently closed, while access is only possible from the Dorota side. This track is terminated by a retaining trestle, and the exit towards Dorota is protected by a protective rib. Entry from the siding is possible on a signal on the shunting dial. Train traffic at the station is conducted by the "KJ" signal box, which has E-type relay equipment with light signaling. From the signal box, the horns on the level crossing are also operated.

In 2015, the station was reclassified from a siding to a branch and freight station.[1]

Tracks in the station

Juliusz, Source Semaforek.pl
  • All switches are 40km/h only

Gallery

Acknowledgements on the creation of this page
  • Roman - Created page
  • Bprog - Speed information via switches.