Translations:Sedziszów/10/en
Jump to navigation
Jump to search
Train traffic in the station is controlled by signals 'Sd', 'Sd1', 'Sd2' and 'Sd3', which have centralised mechanical equipment with light signalling, while the signal 'Sd2' is not continuously manned. Some points are electrically operated. The control station also operates the points at the crossing [1].